SERVICES
Borewell Drilling Services
DTH, rotary and slow-rig borewell drilling for homes, farms, apartments, commercial sites and industry, from 150 to 1,500 ft in 4.5", 6", 6.5" and 8" diameters.
- Written, itemised quote
- Partner rig operators across India
- Call or WhatsApp a person

Drilling methods
DTH (down-the-hole) drilling is best for hard rock and rocky terrain. Rotary drilling suits soft or alluvial soil. Slow rigs help on difficult ground and in tight spaces. We recommend the method after looking at your site and, where available, survey results.
Depths and diameters
Homes and apartments usually need 150–600 ft, farms 300–1,200 ft or more, and industrial borewells 600–1,500 ft. Common diameters are 4.5", 6", 6.5" and 8". See 4.5-inch and 6.5-inch drilling.
Rigs for every site
Truck-mounted and tractor-mounted rigs cover open land, farms and rural projects as well as residential plots and gated communities with tight access.
What is included
Drilling to the agreed depth, PVC or MS casing, flushing, and a yield test in litres per minute (LPM). Pump installation and annual maintenance (AMC) can be added.
BEFORE YOU BOOK
Have these ready for a quick quote
- Exact location and access for the rig vehicle
- Use: home, farm, commercial or industrial
- New borewell, rebore, or a problem with an existing one
- A written, itemised quote before work starts
Availability and the rig date are confirmed once we know your location and requirement.
STEP BY STEP
The borewell drilling process
Eight stages, from the first site visit to a clean, working borewell.
01
Site visit & groundwater survey
A site visit and, where you want one, a scientific water survey using resistivity testing.
02
Water point identification
The most promising water-bearing zone is marked, based on geological analysis.
03
Rig mobilization
DTH, rotary or slow rigs are mobilized based on your site’s terrain, access and depth needs.
04
Drilling & borewell construction
Drilling is done to the required depth (150–1500 ft) with structural precision.
05
Casing pipe installation
PVC or MS casing protects the borewell from collapse and contamination.
06
Yield test & measurement
Discharge is measured in litres per minute (LPM) so you know what the borewell delivers.
07
Pump installation
The right pump is installed for the depth, water level and how you will use the water.
08
Cleaning & commissioning
Final flushing, disinfection and setup, so the borewell is clean and ready to use.
COST GUIDE
Borewell drilling rates
Typical depths and per-foot ranges published on this site. Your rate depends on depth, rock, diameter and rig access.
| Borewell type | Typical depth | Drilling method | Indicative cost per foot |
|---|---|---|---|
| Residential | 150–600 ft | DTH / Rotary | ₹80–₹180 |
| Agricultural | 300–1,200 ft | DTH | ₹100–₹250 |
| Industrial | 600–1,500 ft | Heavy DTH | ₹150–₹280 |
Indicative ranges as published on this website. Your rate depends on depth, rock and soil, diameter, rig access and transport, so ask for a written quote for your site.
A FAIR QUOTE
Ask for these lines separately
- Drilling, priced per foot by depth stage
- Casing pipe (PVC or MS) and fitting
- Rig transport and site access
- Flushing and yield testing
- Pump, cable and pipework (if required)
- Taxes and anything excluded
What is the borewell drilling cost per foot in India?
Published ranges on this site run from about ₹80 to ₹250 per foot for most homes and farms (up to ₹280 for heavy industrial drilling). The rate for a site in India depends on depth, soil and rock hardness, borewell diameter and rig type (DTH or rotary). Ask for a written quote that lists drilling, casing pipe, rig transport and any pump work separately. You can use the cost worksheet to compare quotes.
How deep should a borewell be in India?
Homes and apartments usually need 150–600 ft, and farms 600–1,200 ft or more. The final depth in India depends on the water table and the local geology at your plot, so agree the target depth and the per-foot rate for each depth stage before drilling starts.
Which is better: DTH or rotary drilling?
DTH (down-the-hole) drilling is best for hard rock and rocky ground. Rotary drilling suits soft or alluvial soil. We recommend the method after looking at your site and, where available, survey results.
How long does it take to drill a borewell?
Most borewells are drilled in 4 to 8 hours, depending on depth, ground conditions and site access. Rig travel, casing, flushing and pump work are additional.
What is charged apart from drilling?
Casing pipe (usually PVC, sometimes MS) is charged separately because it is fitted during drilling. Rig transport, flushing, yield testing and any pump installation should also appear as separate lines on your quote.
Can you drill in a small plot or gated community?
Yes. Tractor-mounted rigs suit tight access spaces such as residential plots and gated communities. Tell us the gate width and any overhead lines when you enquire.
What happens if the borewell does not give enough water?
Groundwater and yield cannot be guaranteed by any contractor. Before drilling, agree how deep to go, when to stop, and how the work will be charged if the yield is low, so there are no surprises.
Do I need permission to drill a borewell in India?
Rules differ by state and sometimes by district; some areas need approval from the state groundwater authority or local body before drilling. Our state rules and guidelines page lists what we have published for each state. The property owner is responsible for approvals, and we can tell you what we know before you book.
How do I get a quote?
Call, send a WhatsApp message or use the quote form with your location, the type of property and what you need. We reply with the next steps and a quote for your site.
TALK TO A PERSON
Speak to someone who drills borewells
No forms needed. Call, send a WhatsApp message or a photo of your site, and you will talk to a person who knows rigs, rock and pumps.
MORE SERVICES
Other borewell services

Groundwater survey
Electrical resistivity testing and geological layer mapping to choose a drilling point before the rig arrives.

Pump installation
V3, V4, V6 and V8 submersible, jet and compressor pumps, sized to your bore depth, water levels and expected yield.

Flushing & cleaning
High-pressure compressor flushing, chlorine disinfection and removal of sand, silt and debris from old or low-yield borewells.